Oracle EBS 12.2.x: ADOP error during Cutover phase

Background of the issue: I was applying hrblobal driver in a multi-node Production environment. Our Production application EBS has one Primary node and one DMZ Node.


After applying hrglobal driver using the online patching cycle, Cutover phase thrown below error message


==

Applying patch(es): <6390830> on node EBSDMZ failed.
If you choose to proceed with cutover, node EBSDMZ will be marked as abandoned.
Do you want adop to continue processing on completed nodes [y/n]? n
    As per user choice, adop will not proceed further with processing.


==


If we Provide input as ‘Y’ above, EBSDMZ node will be abandoned and we need to register the DMZ node again.




Solution:


1.Apply Patch on DMZ node using options=nodb and restart the cutover phase


On DMZ Node
=====
Source the patch filesystem
adop phase=apply patchtop=$PER_TOP/patch/115 patches=driver:hrglobal.drv allnodes=NO action=nodb options=forceapply


2. Restart Cutover phase on Master node


13 thoughts on “Oracle EBS 12.2.x: ADOP error during Cutover phase”

  1. Trang web đánh bạc trực tuyến này có các chính sách nghiêm ngặt về việc bảo vệ thông tin cá nhân của game thủ, giúp họ cảm thấy an toàn hơn trong các hoạt động cá cược. Dịch vụ thanh toán nhanh chóng cũng là một yếu tố quan trọng đảm bảo người chơi dễ dàng và nhanh chóng tiếp cận số tiền thắng cược của họ. tải 66b Tất cả những yếu tố này đóng góp vào việc tạo ra một môi trường giải trí độc đáo nơi game thủ không chỉ tìm thấy sự thích thú mà còn an toàn tuyệt đối khi tham gia. TONY01-29O

Leave a Reply

Your email address will not be published. Required fields are marked *